Case Studies

LIDL

Location

Weston-Super-Mare, Somerset, UK - 1998

Main contractor

HBG

Works undertaken

The original specification for pavement construction in external parking areas was amended to allow for subsoil stabilisation to be used to treat suitable available soils to depths of 250mm and 350mm, to a specification equivalent to a capping material (i.e. with a 15% soaked CBR value, and frost resistance where appropriate, where the stabilised soils lay within the frost heave layer). Approximately 5600m3 of primarily clay, with some silty sand deposits, were treated in lieu of offsite removal of surplus spoil, and to replace imported capping material. The works were carried out over a period of 2 weeks, in April 1998.


NHS

Location

City General Hospital, Stoke on Trent - 2006

Main contractor

Laing O’Rourke Midlands Limited

Works undertaken

Approximately 7000m3 of treatment of unsuitable material, to decrease the moisture content and produce a modified fill material.

Location

Alnwick, Northumberland - 2006

Main contractor

Mansell Construction Services Limited

Works undertaken

Approximately 6600m3 of treatment of unsuitable material, to decrease the moisture content and produce an engineered foundation fill material (5% CBR).


Coca Cola

Location

Lisburn, County Antrim - 2006

Main contractor

P J Careys PLC

Works undertaken

Approximately 150,000m3 of treatment to engineer subsoils to increase allowable bearing pressures to 150kN/m2 (building footprint) and 80kN/m2 (external areas); and 100,000m2 of soil treatment, along with HEIC (High Energy Impact Compaction), to produce a stabilised capping material (15% CBR).

Location

Ashford, Kent - 2006

Main contractor

Bluehammer Limited

Works undertaken

Approximately 1000m3 of engineered foundation fill (5% CBR), 1000m3 to provide an allowable bearing pressure of 15kN/m2 (Structural foundation fill) and 5000m2 of capping (15% CBR).

Location

Leeds Valley Park, Leeds - 2005

Main contractor

Bowmer and Kirkland Limited

Works undertaken

Approximately 15,500m3 of capping (15% CBR).


NHS

Location

City General Hospital, Stoke on Trent - 2006

Main contractor

Laing O’Rourke Midlands Limited

Works undertaken

Approximately 12,500m3 of treatment to achieve an engineered foundation fill specification (5% CBR).